MelzI d'Eril 34
In the Parco Sempione area, Asti Architetti has just completed an innovative office complex. This project has renovated the existing building, by modifying its height, to design an office building consisting of seven above-ground floors with an internal courtyard interconnected with high low-rise bodies along the perimeter.
The lower part, is characterized by the use of Gré stump stone, which better matches typical Milanese materials. The upper part, use burnished anodized aluminum vertical slats, which is a useful difference that helps identify the elevated parts and to fractionalize the size of the building.